KEVIN NELSON, LEED AP, PMP
385 Crestwood Drive, Cheshire, CT 06410 203-443-0347
Kevin_nelson@snet.net
A
business leader with a remarkable track record at managing a diverse range of
complex projects. A manager specializing in the application of
continuous quality improvement standards to major capital projects.
Member, US Green
Building Council, Project Management Institute. LEED Accredited,
February, 2008; PMP Accredited, October, 2009. Member, Cheshire Half
Marathon & 5K Foundation Executive Board, 2012 to present.
Bachelor of Science,
Engineering, Construction Management Department - University of Nebraska -
Lincoln
Information
Technology Skills
Manager responsible for training and
maintenance of Primavera Contract Management Software. Extensive
knowledge of MS Project and Primavera P6 scheduling software, MS Office, Outlook,
Lotus Notes, STORMS Work Management System. Author of multiple database
applications used to streamline the construction management process.
Planning, Risk, and
Cost Analyst, Resource Group/Northeast Utilities 6 –
09 to Present
Responsible for the
development and maintenance of the program and risk management plans, group
performance metrics, budgets, and schedules for a five year, $120 million
capital improvement program. Specific duties include the creation of
yearly business plans, performance metrics, master and
detail schedules, long range and yearly budgets, yearly risk management
plans, performance measurement standards, recovery schedules and cost control
strategies.
Senior Project
Manager, Newfield
Construction, Inc. 8-07 – 5-09
Manager in charge
of all aspects of project performance for the Springfield MA. LA Fitness
Center, and the Woodbridge Fire Station projects.
Senior Project
Manager, PAC Group LLC, 2-06 – 8-07
Manager
in charge of construction for the Boehringer Ingelheim Child Care Facility
and Yale University Walpole Library Projects.
Project Manager, Newfield
Construction, Inc., 9-99 – 2-06
Manager
in charge of nine projects totaling $77 million in value. Highlights
include:
·
Construction
of a class 100,000 clean room manufacturing facility in ten weeks, permitting
to manufacturing start.
·
Planned,
staffed and managed an Army Reserve Center expansion/renovation program on
time and at a profit margin 300% greater than original estimates.
Nominated for “Contractor of the Year Award” by the client, the Army Corps of
Engineers.
·
Designed
the schedule and master plan for the renovation and adaptive reuse of a
150,000 SF Navy training and administration building. The work required
complete renovation of all mechanical and electrical systems, hazardous
material abatement and refinishing while the building remained partially
occupied. Implemented management programs resulted in client performance
rating of excellent and profits 380% greater than the original forecast.
·
Development
and implementation of new technologies applied to the construction management
process. Examples include digital photography and voice recording,
digital submittals and project correspondence, and electronic storage and
archiving.
·
Took
over a stalled renovation/adaptive reuse project for Travelers
Insurance. Successfully completed 100,000SF of office/administration
area in 12 weeks.
URS Corporation,
New York, NY
Project Controls Manager
5/98 – 9/99
Program
Manager
4/95 - 4/98
Scheduler/Controls Mgr.
8/94 - 4/95
Project
Controls Manager
Held corporate responsibility for all project planning
and control systems for the region. Managed a staff of project
scheduling specialists planning in excess of $500 Million in construction per
year.
Program Manager
Manager in charge for a $50M retirement facility
renovation and expansion program, Rye, NY. Responsible for all aspects
of the job; cost control, dispute resolution, quality control, schedule
evaluation and project closeout. Administered to five general
construction contracts and four architect/engineer design agreements.
Successfully negotiated the settlement of $2M in claims using alternative
dispute resolution methods.
Provided logistics planning and extension of staff
support to a $25M summer construction program, Columbia University.
Scheduler/Controls
Mgr.
Developed a 1,200+ activity master schedule for a ten
construction and twelve design agreement, Central Connecticut State
University Special Olympics Program. Provided schedule maintenance and
analysis as needed to complete the program on schedule.
FIP Corporation, Cheshire, CT
Project
Manager/Estimator
5/89 - 4/94
Total responsibility for the profit, loss and daily
construction operations for a $26M, 120,000 SF design build
telecommunications data center, Meriden, CT. Manager in charge for
bidding, contract negotiation and construction of a $2M Post Office, Monroe,
CT. Created software applications for the collection and evaluation of
subcontractor bid information.
Tambone Corporation, Palm Beach Gardens, FL
Construction Manager
2/85 - 5/89
Responsible for all design and construction activities,
Florida region. Managed all aspects of the real estate development
process; from land use studies to tenant fit up for speculative and build to
suit office, retail and warehouse/office flex space
buildings. Successfully completed a 140,000 SF build to
suit office building project, from schematic development to tenant occupancy,
in 14 months.
Weitz Company, Palm Beach Gardens, FL
Project
Engineer
1/79 - 12/81
Project
Superintendent
12/81- 6/84
Estimator
6/84- 2/85
Assisted the Project Manager - buyout, planning,
scheduling, shop drawings, monthly cost reports, subcontractor coordination
and closeout. Manager of project field operations, apartment and
department store buildings. Provided quantity surveys, pricing, and
quote evaluations. Reported to the regional estimating manager.
$5.8 Million Woodbridge Fire Station Project., The
60,000 SF project includes automated lighting, access and building
environmental control; truck area radiant heating and exhaust evacuation
systems.
$6.2 Million LA Fitness Center, Springfield, MA.
The 80,000 SF facility is an expansion and adaptive reuse of the former
Basketball Hall of Fame building. Major features include a swim pool
and spa, basketball court, day care area, aerobics and spinning rooms, as
well as typical gym free weight and treadmill workout areas.
$4.7 Million Yale University Lewis Walpole Library
Expansion. 14,000 SF expansion and renovation of a historic
landmark. Project included LEED program certification, geothermal
heating and cooling and environmental controls capable of maintaining precise
temperature and humidity levels
$7 Million Boehringer Ingelheim Child Care
Facility. Construction of a new 20,000 SF day care facility.
$17.2 Million Eastern Connecticut State University
Student Center Expansion and Renovation.
$6.5 Million Design/Build Factory Conversion, Eppendorf
Manufacturing, Inc. Design and construction of a 52,000 SF injection
mold plastics facility for a medical research product manufacturer.
Work included a 18,000 SF clean room.
$11 Million Navy Sub Base Building 83
Renovations. Complete renovation of a 150,000 SF administration
building originally constructed in 1934. Project scope includes
extensive hazardous abatement, window replacement, exterior façade
restoration, removal and replacement of all mechanical and electrical systems
and replacement of all finishes. All work is done while the building is
occupied.
$16 Million Berry-Rosenblatt Army Reserve Center, West
Hartford, CT. Renovation of existing structures and construction of
three new buildings. Facility functions include training, medical
processing, vehicle maintenance, equipment storage and administration.
$6 Million Bradley Airport Terminal Expansion and
Concourse C Construction, General Trades. Management of general trades
work including selective demolition, fireproofing, doors, millwork and
specialty items.
$1.5 Million Pratt Whitney Secured Coatings Facility,
East Hartford, CT. Adaptive reuse construction of a 30,000 square ft.
area for defense industry aviation coatings.
$4 Million Home Depot, Wallingford, CT. 135,000
square ft. retail facility constructed in six months.
$12 Million Travelers Insurance Field Office, Hartford,
CT. 180,000 square ft. data center to office building adaptive
reuse, fast track project. Planned, bought out and managed the interior
demolition and construction while the project was undergoing an extensive
hazardous abatement and total re-roofing program.
$178 Million NYC Dept. of Design and Construction
School Rehab Program. Cost reporting system for façade repairs, window
replacement and roof replacement at seventy seven schools.
$50 Million Osborn Retirement Community, program
management. Historic renovation of 200,000 SF of buildings constructed
from 1905 to 1934. Construction of seventeen new buildings which range
from wood frame townhouses to four story apartment buildings and skilled
nursing facilities.
$25 Million Columbia University Summer Construction
Program, logistics and time management services. Renovation of
gymnasium and classroom space, installation of a campus wide chilled water
system.
$45 million Ninth Square Project, construction
management. Historic renovation of eight buildings and construction of
six new structures including two parking garages, three apartment buildings
and one office building.
$33 Million SNET Data Center, project management.
120,000 SF steel frame building with precast panel façade, 100% system
automation and redundancy, 4,200 KW standby generation capacity.
$16 Million NCCI Corporate Headquarters, program
management. 140,000 SF, two story, steel frame office building and data
center.
$5 Million Waterford Apartment Building, construction
management. 77,000 SF, three story cast in place concrete apartment
building.
$20 Million John Knox village Towers, construction
management. 235,000 SF, ten story cast in place concrete
structure apartment building.